Printer Friendly Version

A Messersmith wood chip fired boiler was recently added at the Mt Anthony High School, located in Bennington, VT. Mechanical work included piping the boiler and the three existing oil boilers. A primary – secondary piping system was employed so that system water only entered boilers that were active and producing heat. This eliminates losses from inactive boilers. New DDC Controls were provided for the boiler room operations.